Project Taurus / Colorado Springs / DEPN-26-0039
Source Library
Official project records, applicant documents, independent review, media framing, policy context, and blocked captures for Project Taurus.
Source library
Start with project records, then context
Use official project records for project-specific facts. Use media sources for public framing. Treat failed or blocked captures as access notes, not substantive evidence.
Colorado Springs Accela DEPN-26-0039
Official planning portal record for Project Taurus.
City LandRecords MapServer
Public ArcGIS service used for parcel orientation display.
Colorado Springs UDC development plan section
Official code section used as a process guardrail for development-plan review.
Official code section used to frame major/minor modification questions. Local command-line captures returned challenge pages; browser-accessible official text was reviewed separately.
Official code context for commercial and industrial use framing.
Public utility standards page for electric, water, and wastewater service details.
Public entry point for tariffs, rate sheets, service standards, and utility rule documents.
Public CSU framing for large electric users and cost-protection guardrails; not a Project Taurus service agreement.
Public water-supply planning context; not a Project Taurus allocation record.
Public water-service-extension context; not a direct Project Taurus finding on the current record.
Integrity Matters Project Taurus page
Use as public-opposition and public-claims framing only, not as verification of technical claims.
Raeden public-comments response, April 22, 2026
Applicant-attributed water, tariff, SCR, permit, and jobs statements.
Full project statement, third submittal, May 27, 2026
Site reuse, former Intel context, chiller/generator yards, sound walls, use/zoning framing.
DLAA mechanical noise study, revision C, May 29, 2026
Noise model, 36 chillers, 30 enclosed diesel backup generators.
HEI independent noise memo, June 1, 2026
Independent normal-operation noise model check.
Approval, fee determination, plan conditions, and follow-on records.
Secondary confirmation and reported June 22 appeal deadline.
Public concern and meeting framing.
Town hall and opposition framing.
Early proposal and public concern framing.
Colorado HB26-1030
State data-center and utility modernization context.
Colorado SB26-102
Large-load data-center policy context.
Access limits
The captured Colorado Springs node 163177 page was an access-denied shell. Data Center Dynamics and Axios local captures in the June 14 bundle were blocked/challenge shells and should not be treated as substantive local evidence unless separately accessed.